Mold design

A high quality mold start with mold design. we got a team of skilled design engineers using  latest series of design software system, we can provide customer thought service.

The software we employ includes Pro/E wildfire 4.0, AutoCAD 2008, SolidWorks 2008, Mastercam x, UG NX8.0, Mold Flow Advisor


Our Engineering Team is here for you with following services:
1) Reverse Engineering
2) DFM (Design for Manufacturing) process. Feasibility Analysis Report will be offered prior to mould design.
3) Mould Flow Analysis is to verify gate location ,wall thickness ,war page, shrinkage and potential issues before mould building
4) With our advanced software solutions, we can produce highly detailed computer-aided design and manufacturing drawings including 2D drawings and 3D models for the customersr confirmation.


Mold building
Our company is equipped with advanced mold manufacturing and inspection devices. we have strong mold making team with rich experience to provide you good quality according with your unique need. all mold components are subject to passing a rigorous quality inspection at the completion of each and every production process.
   
Mould material is very important for mould lifespan,we consistently use the high-standard steel material and mould bases to meet your high-quality expectations. The CMTR (Certified Material Test Report), Heat Treatment Report and a complete set of Mould Parts Inspection Report will all be offered.

We are good at making
single cavity to multi-cavity harden mould
insert and over-molding mold
Unscrewing mold
Prototype mold (Aluminum alloy and soft steel)

Mold-building standard we can make
Mold Steel: ASSAB (Sweden), DIN(Germany),DAIDO (Japan),LKM (China).
Mold Base:  DME, HASCO, FUTABA, LKM or equivalent.
Hot Runner: YUDO, HASCO, DME, MASTER

Mold Process Progress Flow:


Mould test
When the mould building is completed, our Quality Control Department will conduct mould test and provide the customer test samples for final confirmation. Every mould testing, we will offer test parameter table and then create checking report within 3 days.also If our clients do not joint our mould test we will make mold test video to let them see mould running condition.

 


                                               Plastic Injection Test Video                                                                                              Die Casting Mold Test Video
top